Latitude & Longitude Building, Croydon
Appointed as Principal Contractor for the scheme, Bower Fuller completed the first phase of the boosted cold water mains renewal at the Longitude and Latitude residential block in Croydon.
After many years of experiencing issues with the existing UPVC pipework on the scheme, including leaks and burst pipework, the client decided to replace the mains pipework network with a more durable copper solution.
In our role, we delivered the pipework replacement works, along with modifications to the existing main cold-water booster sets serving both buildings. The wider scope also included new water conditioners and a robust leak detection system.
The existing building / flats remained in occupation during the works, therefore careful co-ordination and planning was required to ensure the absolute minimum disruption to the occupiers during the short 10-week programme.
The first key element of the project established the new mains water infrastructure across the basement and up through the risers, together with the associated builderswork, fire stopping and the like. Once all of the pipework was complete, we began a carefully managed changeover process with mini shutdowns of the water supplies to the apartments. These works involved a full shutdown of the cold-water pipework to allow the modifications to the cold-water booster set and the installation of the new water conditioners. We then started the phased changeover from the existing mains on to the new system, involving a systematic transfer of 66 individual flats, keeping each interruption as brief as possible.
Following completion, all the existing pipework was fully stripped out and the openings made good.