Central Foundation Girls School, 6th Form
We were appointed by main contractor Sinden Construction to deliver the complete mechanical and electrical package for a new classroom block at Central Foundation Girls’ School in Bow, London. The scheme extended the existing building with six additional classrooms across the first and second floors, supported by new staff and WC facilities, a third-floor plant room and an external plant area. Forming part of the school’s continued investment in high-quality learning spaces, the extension increases capacity and creates a contemporary setting for post-16 education. Delivering the works within an occupied school called for close collaboration with the client team and teaching staff, alongside meticulous planning to keep disruption to a minimum. Particular care was taken when connecting the new electrical and water supplies to the existing infrastructure. Our electrical installation encompassed internal and external lighting, small power, fire alarm, security and public address systems, all fully tested and commissioned. The mechanical package featured a roof-mounted air handling unit with heat recovery, air source heat pumps, heating distribution and mechanical ventilation, together with domestic hot and cold-water services and above-ground drainage. Together, these solutions provide modern, efficient, and reliable building services while maintaining a comfortable environment for students and staff. The result is a thoughtfully integrated extension that combines six new classrooms, dedicated toilet facilities and purpose-designed plant space to support the school’s future needs.
