Following on from the successful completion of Phase 1 of this new secondary school, Bower Fuller has completed the second phase.

Phase 2 provides a fantastic addition to the existing facilities and core education focus. The extension is a 2160sq metre two storey structure and includes flexible classroom spaces, an administration suite, commercial kitchen and dining area, as well as a new reception and main entrance.

A central plant area completed as part of Phase 1 had space left to accommodate a second wood chip boiler to serve Phase 2.

Passivent natural ventilation systems operate in the classrooms and central street area via the BMS.

The Phase 1 services include gas, domestic water, sprinklers and heating, all extended from Phase 1 with a new submain cable from the main panel providing power.

Electrically, power, lighting, access control, CCTV, and fire alarm systems were all completed.

 

 

Role:

Mechanical and Electrical Contractor

Client:

Concertus

Main Contractor:

Wates Construction

Architect:

Concertus

Value:

£1.0M